YETIANPRECISION HARDWARE

YETIAN PRECISION

Quality management

Inspection at each manufacturing stage.

Inspection flow

  1. Raw materials · incoming inspection
  2. Die casting · process inspection
  3. Secondary operations · operation inspection
  4. Outsourced finishing · return inspection
  5. Product release · inspect and store

Nonconforming parts

Return, rework or repair with reinspection, or scrap. Concession release requires authorization in line with customer requirements.

Coordinate measurement
Coordinate measurement
Vision measurement
Vision measurement
Inspection in the workshop
Inspection in the workshop

Material & performance

Spectrometry, tensile and hardness testing, and salt-spray testing. Inspection methods and reporting requirements are agreed for the project.

IATF 16949:2016 certificate supplied by Yetian

IATF 16949:2016

Scope: production of aluminum and zinc alloy die castings for sunroofs. Product design excluded.

Certificate states validity through 13 June 2028. Request current qualification documents for supplier approval.

Discuss your project

Drawings. Material. Quantity.

Request a quote